C
CAIBots
Credit Underwriting · Agentic AI
TIER 2 ACCESS · PILOT & CAPABILITIES DOCUMENTATION
No credentials?
Request Tier 2 Access
Complete the live demo first, then request access to pilot & capability documentation.
📅 Schedule a Call
Authorized access only · CAIBots © 2025–2026
C CAIBots
C
CAIBots
CONFIDENTIAL · FOR AUTHORIZED PERSONNEL ONLY
SYNTHETIC DEMO DATA · NOT LEGAL OR CREDIT ADVICE
Pilot Documentation · Credit Underwriting AI

90-Day Pilot
Structure

Credit Underwriting Agentic AI · V1.1

Pilot Duration90 Days (3 Phases · 30 Days Each) Loan ScopePhase 1: Consumer/HELOC · Phase 2: SBA + CRE · Phase 3: Full Suite Success Gate≥85% Agent Accuracy · ≤5% Exception Rate · SR 11-7 Sign-Off Go-Live CriteriaSR 11-7 Validation Complete · Fair Lending Review Clear · LOS Bi-Directional Confirmed VersionV1.1 · March 2026
01
Pilot Overview
A Structured Path from Demo to Production
Three 30-day phases with clear entry/exit criteria, success metrics, and governance gates at each milestone.
90
Total Pilot
Duration (Days)
3
Structured
Phases
8
Loan Types
Activated
Pilot Design Principle

The pilot is designed as a shadow-mode parallel run during Phase 1 — the agent pipeline processes live applications alongside existing manual workflows but does not replace them. Decision authority shifts to the AI-assisted Credit Officer Workbench only after SR 11-7 validation sign-off at end of Phase 2.

Pilot Engagement Model

CAIBots assigns a dedicated Customer Success Engineer and Compliance Integration Specialist for the full pilot duration. Weekly steering committee check-ins with institution credit leadership. Full documentation package provided at each phase gate.

Prerequisite Checklist

LOSLOS API credentials and sandbox access provisioned to CAIBots integration layer
BureauMCO permissible purpose agreement executed · Test credentialed access confirmed
PolicyCredit policy matrix (Excel/PDF) provided for agent configuration upload
LegalBAA executed · Data Processing Agreement signed · Information Security questionnaire complete
ComplianceFair Lending officer briefed · Model Risk Management notified of SR 11-7 project
TeamPilot team roles assigned (see Section 4) · Calendar holds placed for weekly check-ins
02
Phase Timeline
Three 30-Day Sprint Phases
Each phase has defined scope, deliverables, and exit criteria before advancement.
Phase 1
Days
1–30
Foundation & Shadow Mode
Integration, Configuration & Shadow Run
LOS integration, data source connectivity, policy matrix upload, and parallel shadow-mode processing of Consumer/HELOC applications. Zero impact to existing decisioning workflow. CAIBots outputs logged for comparison.
LOS bi-directional API integration and field mapping validation
MCO bureau, CoreLogic AVM, and Credit Policy Engine connectivity verified
Agent pipeline configured for Consumer/HELOC loan type
Shadow-mode run on 100 live applications — outputs compared to manual decisions
HITL threshold calibration workshop with credit leadership
Phase 1 accuracy report: target ≥85% decision alignment
Phase 2
Days
31–60
Expanded Scope & Validation
SBA 7(a) + CRE&I Expansion & SR 11-7 Validation
Expand pipeline to SBA 7(a) and CRE&I loan types. Run parallel with manual workflow. Model Risk Management conducts SR 11-7 validation review. Fair Lending officer completes ECOA/HMDA compliance review.
GSFA/EDGAR financial spreading agent activated for commercial loans
SBA SBSS and D&B Paydex bureau integrations tested on live SBA pipeline
CoStar CRE valuation agent validated against 25 in-process CRE appraisals
SR 11-7 model validation package delivered to Model Risk Management
Fair Lending parallel test: 200 applications reviewed for disparate treatment signal
Credit Officer Workbench UAT with 5 credit officers — feedback incorporated
Phase 2 gate: SR 11-7 validation sign-off required to advance to Phase 3
Phase 3
Days
61–90
Full Suite & Go-Live Prep
Full Loan Suite Activation & Production Readiness
Activate Construction, ABL, DSCR Alert, and Maturity Renewal loan types. Credit Officer Workbench moves to primary workflow for validated loan types. Prepare production cutover, training, and ongoing governance framework.
Construction draw analysis and ABL borrowing base agent configurations activated
DSCR Alert portfolio monitoring engine connected to existing portfolio system
Maturity renewal pipeline configured and tested on upcoming renewal queue
Full credit staff training sessions (2 hours per cohort · 4 cohorts planned)
Production cutover plan reviewed and approved by Credit and IT leadership
Ongoing model monitoring framework established — KPI dashboard live
Go-live authorization obtained from CRO and Chief Compliance Officer
03
Success Criteria
Pilot Success Metrics & Go-Live Gates
Quantified success thresholds required for production authorization at each phase gate.

Phase 1 Exit Criteria (Day 30)

≥85%
Decision Alignment
vs Manual
Consumer/HELOC · Shadow run
≤5%
Policy Exception
Rate
Below institution baseline
100%
ECOA Screen
Coverage
Zero unscreened decisions

Phase 2 Exit Criteria (Day 60)

SR 11-7
Model Validation
Sign-Off
MRM approval required
≥90%
Financial Spread
Accuracy
vs CPA/manual benchmark
4.5/5
Credit Officer
UAT Score
Workbench usability rating

Production Go-Live Gate (Day 90)

Go-Live Authorization Checklist

All of the following must be confirmed before production authorization: (1) SR 11-7 Model Validation complete and signed by Model Risk Management Officer; (2) Fair Lending review complete — no disparate treatment signal in parallel test sample; (3) LOS bi-directional integration verified in production environment; (4) Credit staff training completion ≥90% of eligible users; (5) CRO and Chief Compliance Officer sign-off; (6) Incident response and escalation runbook approved by IT Security.

04
Team Structure
Pilot Team Roles & Responsibilities
Required institution roles and corresponding CAIBots counterparts for the 90-day pilot.
Institution · Sponsor
Chief Risk Officer / CRO
Executive sponsor. Approves pilot scope, phase gates, and production go-live. Reviews SR 11-7 validation results and Fair Lending findings. Final authorization signatory.
Institution · Operations
VP Credit / Chief Credit Officer
Operational owner. Defines HITL thresholds. Reviews shadow-mode accuracy reports. Participates in weekly steering. Approves Credit Officer Workbench design.
Institution · Compliance
Fair Lending Officer / CCO
ECOA/HMDA/CRA compliance review. Reviews fair lending parallel test results. Signs off on Reg B adverse action notice template. Completes Phase 2 compliance gate.
Institution · Risk
Model Risk Management Officer
Leads SR 11-7 model validation. Reviews agent documentation package. Completes validation testing protocol. Issues Phase 2 MRM sign-off for production authorization.
Institution · Technology
IT / LOS Integration Lead
Owns LOS API integration. Provisions credentials for bureau and collateral sources. Manages data security review. Validates production environment pre-cutover.
CAIBots · Engagement
Customer Success Engineer + Compliance Integration Specialist
Dedicated team for full pilot. Owns technical integration, policy configuration, SR 11-7 package preparation, training delivery, and weekly steering facilitation.